1.
The height of a scaffold is measured:
2.
Spray painting shall not be performed within of ignition sources (welding, Cutting, smoking area, electrical generator).
3.
The maximum voltage permitted for portable power too is:
4.
How must gap there must between a face of a surface or building the platform of guardrail?
5.
flammable material storage areas cannot be located within of other building structures:
6.
The supplied air for hoods or respirator shall be of the proper type _____________________
7.
A straight or extension ladder must extend over the edge of a roof , excavation by a minimum distance of:
8.
The Saudi general instruction which sets forth the work permit receiver's requirement is:
9.
If someone is injured on your job site, a preliminary report must to the Saudi Aramco PMT within __________________period of time:
10.
Work platforms must have toe boards, mid rails, top rails, and access ladders once they reach a height of __________
11.
Lanyard life line, fall arrest system components and anchorage point capacity of:
12.
Two or more lanyards may be connected together to meet the height length, connection must be:
13.
The maximum allowable slopes (H:V) type B for the excavation
14.
Excavation for type C soils (30 ft) requires the inspection of:
15.
During storage of oxygen and acetylene gas cylinders they must be separated by (1) A fire ResA Distance of ___________
16.
Which of the following would be classified as a Class "B" fire?
17.
For excavation greater than 6 m (20 ft) deep regarding shoring design calculation and drawings that need a civil structure Engineer and reviewed by:
18.
Mechanical Excavator shall not be used within__________ of underground utilities
19.
When there are opening in roof work and or at edge of roof and a fall hazard exist, barricades must be installed capable of withstanding a force of:
20.
Which of the following factors does not affect the load capacity of a mobile crane?
21.
Contractors employing more than _______ total people for a given project ( whether working on multiple shifts or not), including personal employed shall assign a Clinic
22.
What is a confine space?
23.
How long is a Work Permit usually valid?
24.
How far part shall access /egress ladder be in excavation?
25.
Incompatible materials that may create a fire hazards shall be segregated by a barrier having a fire resistance of at least _________Hour
26.
When checking the ground on a duplex outlet, which of the following provides the best method?
27.
Which of the following is true concerning explosive equipment? Explosive proof equipment is allowed to operate in a flammable or explosive atmosphere because it is capable of:
28.
How long should the appointed "Fire Watch" remain at the site of Hot work after the work has stopped?
29.
One purpose of the "Anti — two —Block" device on cranes is?
30.
Where might you find Hydrogen sulfide?
31.
What is the number one cause of confined space death?
32.
When lifting over or adjacent to process piping etc, what is required?